Main stages of repair in the apartment or condo

Main stages of repair works in the apartment.

How to start repair of the apartment?

The first stage of the repair of old homes is the damage and taking apart first of all of the shabby walls and partition walls, eliminating the wall and ceiling coating. This phase is among the most "unclean" stages of the repair work.

One more among the most essential and "dusty" works is the window block replacement. It is essential to do this firstly since dirt and dust will be unallowable during following phases and it is restricted at all to open windows during painting and wallpaper works (big drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is required to pack them immediately in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to avoid scratches).

The following phase is circuitry. Circuitry can be installed in walls or along the flooring. Wiring is made inside the pipelines to ensure electrical security and increase reliability. The pipe safeguards wiring from external damages and permits to change the wire entirely without breaking walls and floor just by placing the new wire rather of the old one.

House Painting follows the wiring. The frequent mistake throughout the synchronised conducting of such works happens when employees forget to lay out among the cable televisions and house painters have actually already plastered and smoothed out the wall. As a result, extra works are needed to seal goes after on the ended up wall. The locations of the feed switch and wall outlet location and their number must be thought-out ahead of time. The plan of power circuitry is generally consisted of into the style project.

Later on the system must be prepared to service in case of failures. In addition to the electrical wirings, the telephone cable television and the television cable television are laid out. The power cable television need to not be laid out near the telephone and antenna cable televisions to prevent sound pickup and interference. The most peculiar moment is laying out the television cable. In order to make two (or three) television set in the apartment or condo the second cable is often simply "strongly soldered" Home page in parallel, so the cable television resistance is reduced. As an outcome, the display screen quality is deteriorated, numerous programs can't be gotten and etc. In order to prevent such scenario it is required to invite an expert with special equipment. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-term process, that is why it is conducted all at once in all properties, if it is possible. Hold-ups are related to the innovation. Each applied layer of the plaster (or filling in finishing) should dry completely before the work will continue.

Works in hygienic plans and the kitchen area begin all at once with house painting. It is much better to satisfy so-called "unclean" operate in the top place and simultaneously. In accordance with the strategy of the hygienic professional location welding, wall chasing and pipe run are performed. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.

Then works in sanitary plans are carried out according to the strategy. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below stage is assembling ceiling and laying tiles on the flooring. And at last other sanitary devices, mixers and devices are mounted.

After circuitry, setup of rosette plates and terminal boxes the voltage is checked in all point. Ends of electrical wiring are insulated and laid out into rosette plates. Sockets and breakers are not set up throughout this phase in order to conserve their surface area appearance. The surface puttying of walls is performed at the same time. The technologically specific control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that measures wetness of the material.

The following stage is the process of fill. Fill can be made with different products-- from typical masonry cement-sand mixture to self-aligning floorings. The benefit of the basic mixture is its cheapness, the drawback is that such mix is much harder aligned at the level and the last dry time of such fill is 40 days, only then the next stage of the work with floor can be carried out, i.e. the period is too long. Self-leveling self-aligning floors are far more expensive, however more technological. Lining up takes place practically "automatically" i.e. fluid option of mix is put out, then it runs and you receive the horizontal surface area. The last dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is set up into the fill. If the so-called "damp processes" are inapplicable the technology of the dry aligning (the fill technology) is utilized bases for floorings with adjustable flooring battens are mounted.

After fill door boxes and door are installed. Installation of doors need to take into the account thickness of future flooring covering. After installation the door can be removed its hinges and eliminated up until completion of repair or packed into polyethylene film to safeguard from damages. All at once ceiling can be painted and the tile can be laid in that premises where it was planned. The tile must be laid on the absolutely dry overlay.

Finishing of the flooring mounting depends on the prepared covering. For the most part (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to provide the close repairing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood provides the additional heat- and acoustic insulation. After mounting of the plywood is completed, wallpaper for painting can be pasted on walls.

In premises where surface covering of the floor is laminated floor covering or parquet hoard, the normal wallpapers are pasted (not for painting) in the very first location. Then the floor covering is mounted.

If finish covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the normal wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed consequence is linked only with such rushing procedure when the fantastic amount of dust is produced. In spite of the truth that excellent floor mills are equipped with the vacuum cleaner, the sufficient quantity of dust is precipitated on surrounding subjects consisting of walls. Dust is very acerbic and is terribly washed off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be thought about to be completed. It is left only to install the plinths, ornamental components, breakers and sockets, drape holders, to hang doors, plant-bands and others.

image

In conclusion it is essential to keep in mind that the sequence of works was listed in basic and can alter depending on the certain circumstance-- the number of rooms in property, your resources, peculiarities of the construction of the multilevel facilities. It is based on common sense and everyone capable of analysis can separately produce such a sequence.